12.06.080 Drainage.
The director may require such engineering or grade drawings, calculations,
or computations as necessary to evaluate and insure proper drainage. The
applicant must maintain the flow line of all drainage structures during
excavation, or must provide adequate substitutes for such drainage structure as
may be removed or blocked by the excavation. Should the flow line of a drainage
structure be interrupted or diverted as a result of the excavation, the proper
flow line shall be resorted by the applicant subsequent to the excavation. (Ord.
1583-98 § 3(part), 1998).